Skip to main content
AFRICAEXPLORATION

OFFOUÉ-CENTRE

FLAGSHIP ASSET / GABON / GOLD

STATUSExploration / Development
COMMODITYAu — Gold
LOCATIONCentral Gabon
PERMIT HOLDEROffoué SARL
PERMITG7-542
PERMIT-RECORDED AREA593.97 km²
PLANNED INITIAL FOCUSApproximately 50 km²
ASSET INTERESTMineral finance, royalty and strategic participation

ASSET OVERVIEW

Offoué-Centre is a district-scale gold permit located in central Gabon. The asset covers approximately 593.97 km² and combines a focused initial placer-development strategy with systematic exploration across a substantially larger mineralized district.

Blockdor’s near-term approach is centered on an approximately 50 km² operating area associated with the Offoué river system. This initial zone is intended to provide a practical entry point for field validation, resource definition and phased production planning, while preserving exposure to the wider permit.

The permit contains extensive drainage networks, alluvial environments and prospective geological contacts that may support multiple styles of gold mineralization. Exploration is therefore not limited to present-day river gravels. The broader program is designed to evaluate tributaries, buried paleochannels, structural corridors and potential primary source areas across the district.

Historic and recent field observations have confirmed the presence of gold within the permit area, including visible gold recovered from pan concentrates during reconnaissance work. These observations are encouraging but remain preliminary and require systematic sampling, geological interpretation and technical validation.

Blockdor is applying an evidence-led exploration process to rank targets across the permit. Satellite imagery, terrain analysis, hydrology, structural geology, historical workings and field observations are progressively integrated to identify the areas with the strongest combination of prospectivity and supporting evidence.

The development concept is deliberately phased: begin with a defined river-focused operating area, establish reliable geological and production data, and use that information to guide exploration throughout the larger permit. This structure is intended to reduce early execution risk while retaining the long-term optionality of a district-scale asset.

RECENT ACTIVITY

2026

Environmental and regulatory work has progressed in support of the asset’s transition toward development. The project’s environmental impact study has been completed, with the remaining administrative documentation advancing through the relevant government process.

Technical planning has increasingly focused on the relationship between modern drainage, buried paleochannels and potential upstream gold sources. This work is being used to refine the approximately 50 km² initial operating focus and prioritize areas for field validation.

2024

A reconnaissance program conducted with a technical mining partner examined selected areas of the permit and recovered visible gold from pan concentrates. Field observations also identified contrasting granite-tonalite and greenstone lithologies, together with structural and contact zones considered relevant to broader exploration.

These results provided early confirmation of gold within the permit but do not constitute a mineral resource or reserve estimate.

PERMIT MAP

11.6765° E / -1.0916° N11.8800° E / -0.7940° N11.8800° E / -1.0916° N11.6765° E / -1.0916° NABCDEFGHINITIAL OPERATING FOCUS~50 KM²INDICATIVEWIDER EXPLORATION AREASYSTEMATIC TARGET DEVELOPMENTNGABON LOCATORCENTRAL GABON
593.97 KM² PERMIT BOUNDARY (G7-542)
PLANNED ~50 KM² OPERATING FOCUS

Planned operating-area overlay shown schematically pending final cadastral definition.

  • 593.97 km² permit boundary — G7-542
  • Planned approximately 50 km² initial operating focus
  • Priority river corridors and exploration targets
  • Central Gabon locator

The planned operating-area overlay is schematic and remains subject to final cadastral, technical and regulatory definition.

DEVELOPMENT STRATEGY

START WITH THE RIVER. BUILD THE DISTRICT.

The initial program concentrates activity within a manageable operating block while the wider permit undergoes systematic target development.

STAGE 01

Validate the initial operating area through mapping, sampling, geophysics where appropriate, and bulk-testing of prioritized placer targets.

STAGE 02

Establish a traceable production system connecting extraction, weighing, assay, custody and sale.

STAGE 03

Expand into the wider district as geological evidence identifies additional alluvial, paleoplacer and primary-gold targets.

TECHNICAL DISCLAIMER

Offoué-Centre is an exploration and development-stage asset. References to prospectivity, targets, mineralization or future production are conceptual unless supported by a current independent technical report. No mineral resource or mineral reserve is implied. Areas, operating plans and development sequencing remain subject to field verification, permitting, financing and final technical design.